www.OllyAndBecca.uk
Astrobiology summer school

Three days in a cupboard and other new years’ things.

So I have spent the best part of the last three days in one of our kitchen cupboards. I kid you not, you see when the builders put our kitchen in they took the covers off two vents and installed a cupboard in front of it, the upshot being freezing coldness in the kitchen. So to fix it all I had to do was to pop the back out of the cupboard, squirt some builders’ foam into the holes and put the back back in. Pfff why can’t life be as simple as Becca?

First up; the back of the cupboard fits EXACTLY in, so it can’t pop out, and there are wires behind, so I can’t jigsaw it. I ended up spending about three hours carefully breaking the back off enough so I could see where the wires were. THEN I went at it with a jigsaw, which is the scareiest powertool I have EVER used.

Then to fill the holes; well builders’ foam seemed the way to go, that stuff is wierd. It expands to twice its size overnight and it sets from the outside in. So when I went to cut it down to size the next day I ruptured the wet stuff inside and it slowly oozed out making lots of farting noises, it really was one of the strangest things I have ever seen.

Then to putting the back back, well the old one was distroyed in the great battle of jigsaw, so I had to fashion a new one. And to cheat to put it back I braced it with lots of long screws behind it.

All in all it was a pretty professional bodge up I think.

I also put a fancy pants new shower curtain up (that took me about a day too) which is so solid that it is probably considered load bearing now 🙂 Now just the kitchen flooring to see to.

Leave a Reply

Your email address will not be published. Required fields are marked *